Saturday, April 28, 2012

30-Yard Dumpster

I spent 5 hours loading a 30 cubic yard dumpster with construction debris.  Filled the thing to the brink, with a little help from my pops-in-law.  Best guess is that it was over 3 tons of debris, but we'll see once they haul it away.
Construction debris to be moved.

The main pile.

The dumpster, mostly empty except for some contractor bags I hauled off the front porch.

All filled up.

No more pile.

A look into the dumpster.

No comments: